
11/03/2026
We know the price list for internet access on LOT Polish Airlines Dreamliners
Copy link
TwoContinents
2 January 2025

Cracow Airport is planning to build a temporary passenger terminal to help handle the growing air traffic. The new facility will have up to eight departure gates and will be located on the site of the old cargo terminal.
In 2024, Cracow airport saw a 20 per cent increase in the number of passengers handled, significantly exceeding previous forecasts. The current infrastructure has reached capacity limits, forcing the airport authorities to develop ad hoc solutions, such as the construction of a makeshift terminal.
The planned makeshift infrastructure is intended to be low-cost and quick to build. The facility is likely to be located on the site of the old cargo terminal and will be equipped with eight departure gates, allowing more passengers to be handled until the target solutions are in place.
The Balice Port Authority is aiming to transform Cracow Airport into one of the most important aviation hubs in Central and Eastern Europe. In its long-term strategy, the airport is to be ready to handle up to 20 million passengers a year.
Source: rynek-lotniczy.pl
See other news

11/03/2026
We know the price list for internet access on LOT Polish Airlines Dreamliners

11/03/2026
No more extra charges in Turkish restaurants and cafés

11/03/2026
Two airports in Bucharest have lifted the limit on liquids in hand luggage

06/03/2026
The current situation in Dubai: safety, flights, geopolitical tensions – what is worth knowing?

05/03/2026
Krakow in the sights of Qatar Airways. Flights could start as early as 2027

05/03/2026
Tourist tax increase in Catalonia

05/03/2026
Japanese city wants to offer free train rides to tourists

05/03/2026
Modlin subsidized by Ryanair

05/03/2026
China Eastern Airlines to resume flights to Sweden

05/03/2026
Lufthansa resumes flights to Malaysia