
11/09/2025
Emirates: young children will no longer be able to fly first class using miles
Copy link
Cracow Airport is planning to build a temporary passenger terminal to help handle the growing air traffic. The new facility will have up to eight departure gates and will be located on the site of the old cargo terminal.
In 2024, Cracow airport saw a 20 per cent increase in the number of passengers handled, significantly exceeding previous forecasts. The current infrastructure has reached capacity limits, forcing the airport authorities to develop ad hoc solutions, such as the construction of a makeshift terminal.
The planned makeshift infrastructure is intended to be low-cost and quick to build. The facility is likely to be located on the site of the old cargo terminal and will be equipped with eight departure gates, allowing more passengers to be handled until the target solutions are in place.
The Balice Port Authority is aiming to transform Cracow Airport into one of the most important aviation hubs in Central and Eastern Europe. In its long-term strategy, the airport is to be ready to handle up to 20 million passengers a year.
Source: rynek-lotniczy.pl
See other news
11/09/2025
Emirates: young children will no longer be able to fly first class using miles
11/09/2025
Ryanair will fly from Modlin to Milan-Malpensa
10/09/2025
Wizz Air completely withdraws from Vienna Airport
09/09/2025
How much does a 7-day trip to Dubai cost?
09/09/2025
Poznań Airport has lifted the limit on liquids in hand luggage
08/09/2025
ESTA to the US will increase in price from $21 to $40
08/09/2025
Wizz Air to suspend seven routes from Poland for the winter season
08/09/2025
AI cameras have appeared on the streets of Dubai
08/09/2025
A replica of the famous Italian city is to be built in Dubai
08/09/2025
USA: ban on carrying cordless hair straighteners and curling irons in checked baggage