
19/07/2025
Flight schedule from Poland to the Emirates for the 2025/26 season
Copy link
Cracow Airport is planning to build a temporary passenger terminal to help handle the growing air traffic. The new facility will have up to eight departure gates and will be located on the site of the old cargo terminal.
In 2024, Cracow airport saw a 20 per cent increase in the number of passengers handled, significantly exceeding previous forecasts. The current infrastructure has reached capacity limits, forcing the airport authorities to develop ad hoc solutions, such as the construction of a makeshift terminal.
The planned makeshift infrastructure is intended to be low-cost and quick to build. The facility is likely to be located on the site of the old cargo terminal and will be equipped with eight departure gates, allowing more passengers to be handled until the target solutions are in place.
The Balice Port Authority is aiming to transform Cracow Airport into one of the most important aviation hubs in Central and Eastern Europe. In its long-term strategy, the airport is to be ready to handle up to 20 million passengers a year.
Source: rynek-lotniczy.pl
See other news
19/07/2025
Flight schedule from Poland to the Emirates for the 2025/26 season
18/07/2025
Holidays in Dubai in November - what is the weather like in Dubai then?
18/07/2025
Dubai Accommodation – Where to Stay and What to Choose?
18/07/2025
Accommodation in Dubai near Expo City – business and modernity
18/07/2025
We can expect more routes from Poland to Riyadh soon
17/07/2025
Kuwait introduces a new electronic visa for tourists
15/07/2025
In June, 2.3 million passengers used Chopin Airport
15/07/2025
The windmill blades on the roof of the Moulin Rouge in Paris are turning again
15/07/2025
Air Arabia launches flights to Munich
15/07/2025
Portofino introduces new regulations for tourists