
19/01/2026
Wizz Air cancels flights from Gdańsk to Madeira and Tenerife during the holiday season
Copy link
TwoContinents
2 January 2025

Cracow Airport is planning to build a temporary passenger terminal to help handle the growing air traffic. The new facility will have up to eight departure gates and will be located on the site of the old cargo terminal.
In 2024, Cracow airport saw a 20 per cent increase in the number of passengers handled, significantly exceeding previous forecasts. The current infrastructure has reached capacity limits, forcing the airport authorities to develop ad hoc solutions, such as the construction of a makeshift terminal.
The planned makeshift infrastructure is intended to be low-cost and quick to build. The facility is likely to be located on the site of the old cargo terminal and will be equipped with eight departure gates, allowing more passengers to be handled until the target solutions are in place.
The Balice Port Authority is aiming to transform Cracow Airport into one of the most important aviation hubs in Central and Eastern Europe. In its long-term strategy, the airport is to be ready to handle up to 20 million passengers a year.
Source: rynek-lotniczy.pl
See other news

19/01/2026
Wizz Air cancels flights from Gdańsk to Madeira and Tenerife during the holiday season

19/01/2026
Uzbekistan Airways to launch flights from Warsaw to Tashkent

19/01/2026
The President of Rzeszow-Jasionka Airport among the 100 most influential people in Polish tourism

19/01/2026
Wizz Air will fly from Wrocław to Karlsruhe/Baden-Baden Airport

18/01/2026
By what sea is Dubai located and what is the water temperature there?

17/01/2026
How does Revolut work in Dubai?

16/01/2026
Traffic rules in Dubai

16/01/2026
How to get from Abu Dhabi to Dubai?

16/01/2026
How much does fuel cost in Dubai?

16/01/2026
Dubai Al Maktoum – Airport Guide